Task rhythm

作者: shaneZhang 分类: 商学院,读书笔记 发布时间: 2020-10-16 14:07

The plan contains a sequence. It is necessary to think about whether a certain action requires pre-preparation, and cognition and understanding are required before making a decision.

Decisions and actions are a sequential order. For example, if the decision is used as a report, the team can be actively activated to prepare the report.

The intensity of team tasks can be divided into strengths and weaknesses on the timeline. The tight arrangement of tasks needs to consider the status of the executing party, which is the rhythm of task management.

任务节奏感

计划包含了先后顺序,要思考某行动是否需要事先准备,决策前需要先进行认知和理解。
决策和行动是先后顺序的一种,比如如果决策是用作报告的方式,才能积极的启动团队去准备报告。
团队任务的强度在时间线上有强弱之分,任务的松紧安排需要考虑执行方的状态,是任务管理的节奏感。

本页面支持繁体中文友好显示:Task rhythm

如果觉得我的文章对您有用,请随意打赏。如果有其他问题请联系博主QQ(909491009)或者下方留言!

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注